Central Railway Mega Block on 11 January

Central Railway Mega Block on 11 January

Central Railway, Mumbai Division will operate Mega Block on its suburban sections carrying out various engineering and maintenance works on 11.01.2026 as under:

MAIN LINE

UP & DOWN slow lines between CSMT Mumbai and Vidyavihar from 10.55 hrs to 15.55 hrs

DOWN slow services departing CSMT Mumbai from 10.48 hrs to 15.45 hrs will be diverted on DOWN fast line between CSMT Mumbai and Vidyavihar stations and will halt at Byculla, Parel, Dadar, Matunga, Sion and Kurla stations and further re-diverted on DOWN slow line at Vidyavihar station.

UP slow services departing Ghatkopar from 10.19 hrs to 15.52 hrs will be diverted on UP fast line between Vidyavihar and CSMT Mumbai stations and will halt at Kurla, Sion, Matunga, Dadar, Parel and Byculla stations.

Trans-Harbour Line

UP and DOWN Trans-Harbour Line between Thane and Vashi/Nerul stations from 11.10 hrs to 16.10 hrs

UP & DOWN Trans-Harbour line services will remain suspended between Vashi / Nerul and Thane stations during the block period.

DOWN line services for Vashi / Nerul / Panvel leaving Thane from 10.35 hrs to 16.07 hrs and

UP line services for Thane leaving Panvel / Nerul / Vashi from 10.25 hrs to 16.09 hrs will remain cancelled.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.